Have you noticed the enormous crane currently in the centre of Knaphill?! Well, work is well under way on the construction of the block of 9 apartments on the old library site on the High Street. Large sections of fabricated build are being lifted into place. The sections are already wired and fitted with some of the fitted units. This method speeds up the construction on site, so hopefully the project should be finished soon, and our high street will be much improved visually.